5675 East Shelby Drive
Memphis, TN 38141
Phone: 901-365-1903
Toll Free: 800-222-7866
Fax: 901-366-0447
e-mail: info@eykon.net |
|
 |

Not What You Might Expect �Get the FACTS!
The following are the assumptions used to calculate the �Life-Cycle� savings of using commercial wallcovering rather than painting over a nine to twelve year period.
Assumptions
- Building wall surfaces will be redecorated every 9-12 years.
- Wall surfaces painted every three years.�One coat of primer and two coats of latex paint.
- Labor and material rates are based on survey data from contractors located throughout the US.
- The average costs for labor and material were $.55 for painting and $.80 for wallcovering (exclusive of vinyl wallcovering).
- The costs for material and labor were projected to increase 1.5% per year.
- Vinyl wallcovering costs were projected at $0.37 for Type I and $0.67 for Type II.
- Information is based on survey results only. Actual savings may vary based on actual contractor rates.
| Wallcovering vs. Painting Analysis |
| Material & Labor Costs (Per Square Foot) - Median Values |
| RJF Customer Survey Results - May 2004 |
| |
|
|
|
|
|
Wall |
|
Wall |
| |
|
|
|
|
|
Covering |
|
Covering |
| # |
Regions |
|
|
Painting |
|
Type I |
|
Type II |
| |
|
|
|
|
|
|
|
|
| 1 |
East |
|
|
0.57 |
|
1.28 |
|
1.59 |
| 2 |
Midwest |
|
|
0.57 |
|
1.10 |
|
1.39 |
| 3 |
South |
|
|
0.51 |
|
0.98 |
|
1.29 |
| 4 |
West / Southwest |
|
|
0.47 |
|
1.00 |
|
1.29 |
| |
|
|
|
|
|
|
|
|
| Average Median Cost |
|
|
0.53 |
|
1.09 |
|
1.39 |
| "Wallcovering vs. Painting" Results |
|
South Example
Projected Life-Cycle Savings |
| |
|
|
|
|
|
Wall |
Regional |
|
|
|
|
|
|
| |
|
|
|
|
|
Surfaces |
Costs |
|
|
|
|
|
|
| |
|
|
|
|
|
(Sq. Ft.) |
($/SF) |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Type I |
10,000 |
$1.28 |
|
|
|
|
|
|
| Wall Surface Square Footage in Boxes |
|
Type II |
10,000 |
$1.59 |
|
|
|
|
|
|
|
|
|
|
|
Paint |
20,000 |
$0.57 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
Years From Start Date |
| |
Day #1 |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
| Painting |
$9,400 |
$0 |
$0 |
$9,823 |
$0 |
$0 |
$10,265 |
$0 |
$0 |
$10,727 |
$0 |
$0 |
$0 |
| |
$9,400 |
$9,400 |
$9,400 |
$19,223 |
$19,223 |
$19,223 |
$29,488 |
$29,488 |
$29,488 |
$40,215 |
$40,215 |
$40,215 |
$40,215 |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
| WC |
$22,900 |
$0 |
$0 |
$0 |
$0 |
$0 |
$0 |
$0 |
$0 |
$0 |
$0 |
$0 |
$0 |
| |
$22,900 |
$22,900 |
$22,900 |
$22,900 |
$22,900 |
$22,900 |
$22,900 |
$22,900 |
$22,900 |
$22,900 |
$22,900 |
$22,900 |
$22,900 |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
| Savings |
-$13,500 |
-$13,500 |
-$13,500 |
-$3,677 |
-$3,677 |
-$3,677 |
$6,588 |
$6,588 |
$6,588 |
$17,315 |
$17,315 |
$17,315 |
$17,315 |
| % Savings |
-59.0% |
-59.0% |
-59.0% |
-16.1% |
-16.1% |
-16.1% |
28.8% |
28.8% |
28.8% |
75.6% |
75.6% |
75.6% |
75.6% |

|